Line time
Also called Run time, Machine time
The hours a production line is committed to your run, which is what a co-manufacturer is really selling you.
A co-manufacturer’s scarce resource is not ingredients or labour, it is hours on a line. Everything they charge you is ultimately a way of pricing that, which is why their rates fall with volume — a longer run means fewer setups per unit produced.
Nominal line speed is misleading on its own. A line rated at twelve thousand units an hour will not deliver twelve thousand times eight in a shift, once you account for startup, changeovers, breaks, and the inevitable stoppage.
When you book a slot you are buying a window, not a quantity. If your ingredients arrive late, the window does not move — it goes to whoever is next.